OpenAI / Oracle Stargate I (Abilene, Texas)

C

Texas, US · US · OpenAI Inc.

OperationalExplicit AI InfrastructurePartially Verified

Environment

Water Stress
highB

WRI Aqueduct 4.0, 2023, 2023

Aquifer Stress
Not DisclosedND
Grid Carbon Intensity
401 gCO₂/kWhA

EPA eGrid 2022, ERCT subregion, 2022

Grid RegionERCOT
Drought Risk
medium

NOAA Palmer Drought Severity Index, 2023

Facility

OperatorCrusoe / Oracle
CategoryExplicit AI Infrastructure
StatusOperational
Year Opened2025
Capacity
1200 MWC

First and most complete Stargate site: about four of eight buildings operational by early 2026, running on a mix of on-site natural gas and ERCOT grid power (including local wind). Full build-out is 1.2 GW; a planned 2.1 GW expansion was redirected to other sites, and Microsoft is in talks to lease ~700 MW of Crusoe capacity at the campus.

Location
32.4100, -99.6600 · US
Campus AreaLancium Clean Campus; roughly 4 million sq ft across eight planned buildings
RegionTexas, US
Research statusPartially Verified
Last verified2026-07-18

Evidence (2 sources)

Academic2026

Site status, ~0.3 GW operating estimate, 1.2 GW planned capacity, power mix

Journalism2026

Redirected 2.1 GW expansion; Microsoft lease talks for ~700 MW